Construction of seven (10) Hand-Pump boreholes for rural communities of;
- Agbatala, Etulo, Buruku LGA (2010)
- Tse Iber Anato, Kohov, Kwande LGA (2012)
- RCM Prim Sch Kohov, Kwande LGA (2016)
- Tse Naku, Mba’akase, Vandeikya LGA (2016)
- Tse Abela, Mbawegh, Kwande LGA (2017)
- Tse Ataimo, Kohov, Kwande LGA (2017)
- Luga, Mbatiav, Gboko LGA (2017)
- Tse Chiaun Yegh, Ushongo LGA (2018)
- Tse Buter, Mbajor, Vandeikya LGA (2018)
- Tse Igba,Mbayom, Gwer East LGA (2018)
Leave a Reply